WILBUR J. COHEN BUILDING MAIN ENTRANCE WATERPROOFING & CONCRETE REPAIR
Project Owner:  General Services Administration (GSA)

  • Seal Engineering, Inc. was tasked with troubleshooting extensive leaks along a structural expansion joint system which crossed through the main entrance to the building and above a series of hallways and transformer vaults
  • The final design provided an improved handicap access ramp to the front of building, modified entrance steps and added planters – all while removing, cleaning and re-purposing exterior granite finish elements
  • Waterproofing repairs and expansion joint replacement successfully resolved the building’s long-standing leaks that had been “repaired” several times in the past
  • Provided construction phase services